Belts, rollers and pinch points along the whole length. Inclined sections and loaded belts can move by gravity even when the motor is off.

Create this procedure for your machine

Free preview · printable procedure and DANGER tags from $12

Energy sources on a typical belt conveyor

Every machine is different: check your model's nameplate, wiring and the manufacturer's manual. This is where most belt conveyors get their energy and how it is usually isolated.

EnergyTypical magnitude Isolating deviceHow to control it
Electrical208–480 V 3-phase drive motor and controlsConveyor disconnect (motor disconnect or MCC bucket)Switch OFF and lock and tag the disconnect that feeds this conveyor's drive.
Stored mechanical (motion, springs, tension)Belt tension and take-up; coasting rollersTake-up adjustmentWait for complete stop. Release belt tension only if the task requires it, following the manufacturer's manual.
Gravity (raised or suspended parts)Inclined sections and product on the beltBelt clamp or blockRemove product from inclined sections, or clamp the belt so it cannot run back.
Pneumatic (compressed air)Pneumatic diverters, stops or belt trackers (if present)Lockable air shut-off / dump valveClose and lock the air valve and bleed the circuit (remove if not present).

Shutting it down

  1. Stop the conveyor with its normal STOP control and stop upstream and downstream equipment that feeds it.
  2. Identify the correct disconnect: many lines have several conveyors on separate drives.

Releasing stored energy

  1. Clear product from inclined sections or clamp the belt.
  2. Bleed pneumatic devices and check gauges read zero.

Verifying isolation

  1. Press START at every control station for this conveyor: the belt must not move. Return controls to OFF.

Things people miss

Turn this into your written procedure

Add your company, the machine ID, the voltage and where each disconnect and valve is. You get a machine-specific procedure that follows the structure of 29 CFR 1910.147(c)(4), with an approval block and printable DANGER tags.

Start with the belt conveyor template

Questions

Does a belt conveyor need its own lockout procedure?

OSHA 29 CFR 1910.147(c)(4) requires documented procedures for the control of hazardous energy. A procedure is not required only when all eight conditions of the exception in (c)(4)(i) are met, for example a single energy source that can be readily identified and isolated. Most machines with more than one energy source need a written, machine-specific procedure.

Is unplugging enough?

For cord-and-plug equipment, the lockout standard does not apply when the equipment is unplugged and the plug is under the exclusive control of the employee doing the work (1910.147(a)(2)(iii)(A)). If the plug can be out of sight or reach, use a plug lockout cover with a personal lock.

Is the interlocked guard enough?

No. Guard interlocks and emergency stops are not energy isolating devices and do not replace lockout during servicing, cleaning or clearing jams.